OJW - Swellendam Post & Beam build.
Thursday, 13 August 2015
Timber iQ August - September 2015
Sunday, 22 March 2015
Grand Finale
Oiled sugar gum deck.
Some of the OJW Team on the last day.
Magnificent sling brace truss.
Additional end stair case.
Bathrooms complete with sanitary ware.
View from the new farm house staircase.
Bakkie loaded and ready to return to The Framing Yard in Grabouw,
Home of OJW.
www.ojw.co.za
Internal joinery complete.
Purpose built library book shelves and coffee station installed.
All gutters and double glazing complete.
Gutters directing rain water into collection tank.
Taking shape.
Hand rails to "stoep" installed.
4 m wide stair case added to the front elevation.
Floors finished and sealed.
13 March 2015
Painting taking place
70 mm thick floating vanity manufactured from sugar gum.
Internal work making progress.
T & G flooring being laid on leveling batons with insulation beam fill.
Internal Joinery
Book shelves being manufactured in the workshop, out of sugar gum.