OJW - Swellendam Post & Beam build.
Thursday, 13 August 2015
Timber iQ August - September 2015
Sunday, 22 March 2015
Grand Finale
Oiled sugar gum deck.
Some of the OJW Team on the last day.
Magnificent sling brace truss.
Additional end stair case.
Bathrooms complete with sanitary ware.
View from the new farm house staircase.
Bakkie loaded and ready to return to The Framing Yard in Grabouw,
Home of OJW.
www.ojw.co.za
Internal joinery complete.
Purpose built library book shelves and coffee station installed.
All gutters and double glazing complete.
Gutters directing rain water into collection tank.
Taking shape.
Hand rails to "stoep" installed.
4 m wide stair case added to the front elevation.
Floors finished and sealed.
13 March 2015
Painting taking place
70 mm thick floating vanity manufactured from sugar gum.
Internal work making progress.
T & G flooring being laid on leveling batons with insulation beam fill.
Internal Joinery
Book shelves being manufactured in the workshop, out of sugar gum.
Monday, 16 February 2015
February 12
Roof sheeting with sisilation and insulation being installed.
February 10
External cladding near completion
February 5
End elevation walls installed with sisilation ready to receive cladding.
February
Eucalyptus wide plank cladding installed to the front elevation.
Early February
The roof being closed in with sarking boards which now accentuates the beauty of the sling brace post and beam frame.
January 2015
Eucalyptus deck going down on the front stoep / porch.
Rafters being installed on the roof.