Monday, 16 February 2015

December 2014




The walls were pre-manufactured in the OJW workshop in Grabouw.
Being installed on site.

Sunday, 7 December 2014

Can you guess what it is yet?




View from the loft.


Starting to look like a building.

Frame # 3 assembled and pegged, ready to be hoisted up.

Frame # 3 standing and connected to frame # 4.

View from loft.



Taking shape...

Frame # 4 standing, connected to frame # 5 with horizontal girts and braces.

A view from the loft.




Word is out...


News travels fast.
Girts and braces fitted, ready to receive frame # 4.


Frame # 4  being assembled.

Progress from the loft staircase.

Mid week progress

Frame #5 standing ready to receive connecting girts and knee braces.


Much interest from the resident wildlife.

First frame lift

Frame # 5 assembled in situ

A view from the existing farm house loft stairs
First frame pulled up into its position on the concrete pad stones.