OJW - Swellendam Post & Beam build.
Monday, 16 February 2015
December 2014
The walls were pre-manufactured in the OJW workshop in Grabouw.
Being installed on site.
Sunday, 7 December 2014
Can you guess what it is yet?
View from the loft.
Starting to look like a building.
Frame # 3 assembled and pegged, ready to be hoisted up.
Frame # 3 standing and connected to frame # 4.
View from loft.
Taking shape...
Frame # 4 standing, connected to frame # 5 with horizontal girts and braces.
A view from the loft.
Word is out...
News travels fast.
Girts and braces fitted, ready to receive frame # 4.
Frame # 4 being assembled.
Progress from the loft staircase.
Mid week progress
Frame #5 standing ready to receive connecting girts and knee braces.
Much interest from the resident wildlife.
First frame lift
Frame # 5 assembled in situ
A view from the existing farm house loft stairs
First frame pulled up into its position on the concrete pad stones.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)