Monday 16 February 2015

February 12

Roof sheeting with sisilation and insulation being installed.


February 10

External cladding near completion



February 5


End elevation walls installed with sisilation ready to receive cladding.

February

Eucalyptus wide plank cladding installed to the front elevation.



Early February

The roof being closed in with sarking boards which now accentuates the beauty of the sling brace post and beam frame.




January 2015




Eucalyptus deck going down on the front stoep / porch.
Rafters being installed on the roof.

December 2014




The walls were pre-manufactured in the OJW workshop in Grabouw.
Being installed on site.